LADEE Trajectory Update 10-22-13: Post LOI-3 Commissioning Orbit

Sorry for the delay in updating, Astrogator_Mike had to make the long drive home after LOI-3 and get configured back in his home base.  In the mean time, Lunar Orbit Insertion Burn 3 (LOI-3) was completed successfully (within 0.6% of target) on Oct. 13, 2013.  LADEE’s post LOI-3 orbit had an aposelene altitude of 250 … Continue reading LADEE Trajectory Update 10-22-13: Post LOI-3 Commissioning Orbit